Unfortunately there were some gravel roads which we couldn’t drive because this years rainy season was exceptional wet and long. Some of the tracks were extremly muddy, slippery and partly just washed away.  On the most important north-south connection, the M1, we had to wait for over 7 hours, because a damm was washed away. When we wanted to return a few days later the temporary bridge was gone. The military though built an emergency bridge within 2 days. Apart from that we strolled higgledy-piggledy around the country.

Download file: Malawi total.gpx